~/talk

Moving From Plans to Goals

Talkat CAS 2018 · 2018-11-28..11-29· [testing, frontend-architecture]
links:none on file
slides:none on file

Argues that a Sprint Backlog is a plan but a clear, measurable Sprint Goal changes behavior: introduce a Roman Pichler template after planning, state the objective, method (prototype/spike), and a metric — e.g. goal: fly ≥4 m in the paper‑plane exercise or measure performance by X% for a welcome page. Adoption avoids forcing, uses daily checks tying work to the goal, and links sprint goals to release outcomes. Results: fewer WIP, more collaboration, higher morale, clearer sprint reviews, but initial resistance and partial failures require iteration.

AI-written summary · about

  1. 0:00Introduction and goals
  2. 3:52Activity paper airplane demo
  3. 10:19From plans to goals shift
  4. 12:51Why sprint goals failed
  5. 15:22Roman Pichler template
  6. 21:57SMART goals examples
  7. 24:24Challenges adopting goals
  8. 26:51Daily scrum with purpose
  9. 29:01Linking to release goals
  10. 31:50Final activity and summary
~/search
type to search 6,249 conferences, 138,987 speakers and 185,172 talks
~/help
cmdctrl k
search every conference, speaker and series
/
focus the filter search
h
home
c
conferences
s
speakers
e
series
t
light / dark — the status bar button does the same
?
this help
esc
close this, then clear every filter — or just the search, while you are typing in it

Ignored while you are typing. Pages without a filter rail have no search to focus.