Lean & Lego: Building the Millennium Falcon Redux
summary
Office engineers turn a 5,000‑piece set and a 300‑page manual into a finished Millennium Falcon by applying measurable lean practices: value stream maps, cumulative flow and burn‑up charts, control charts, WIP limits and swarming. They identify a bottleneck (finding tiny parts), introduce a visual queue, split roles into finders and assemblers, and reduce batch size so cycle time drops from days/weeks to hours. Lego’s packaging change to small, ordered bags validates the reduce batch size lesson.
AI-written summary · about
chapters (4)
- 0:00Start
- 2:53Recap on Star Wars (Spoiler alert)
- 11:54Cumulative flow charts
- 49:07batch size, queue depth and cycle time
related talks
49mLean & Lego: Building the Millennium Falcon Redux
51mHow Product Manufacturing Can Teach us to Write Better Software
10mLean, not mean. Building sustainable software with Lean software practices
01h 29mDevOps Culture Simulation (with Lego and Chocolate Game)
41m Lean-agile transformation at Scania
44mHow Lean is Your Scrum
50mThe Story of LeSS
45mLean & Agile: To Infinity and Beyond!
