~/talk

Estimation and Trust-Driven Development

Talkat Ancient City Ruby 2015 · 2015-03-25..03-27· [soft-skills, career-development]
slides:none on file

Estimation treats story complexity as the reliable signal and velocity as the calibratable one: break work into Fibonacci-sized stories, assign points measure complexity, run a couple of iterations to learn throughput, then translate a point to hours (example 5–7 hours/point) and present a low/high range (example project 120–145 points → ~$150k–$250k, with a likely band like $160k–$180k). Avoid false precision, state assumptions, and surface ranges to build trust.

AI-written summary · about

  1. 0:00Start
  2. 0:46better?
  3. 1:08Avoid false precision
  4. 1:49What goes into the amount of calendar time a feature takes?
  5. 2:01Complexity of the task Skill of the developer Time on task
  6. 2:27We are bad at estimating time on task
  7. 7:05Decomposing the problem into similar size chunks helps
  8. 7:56Requires Time
  9. 8:21How do I estimate at the beginning of a project?
  10. 8:36Fake it
  11. 9:12Realize that your output is a range
  12. 10:59At the beginning (and only at the begining) You can range estimate stories
  13. 11:57load factor (5 - 7 hours per point)
~/search
type to search 6,249 conferences, 138,987 speakers and 185,172 talks
~/help
cmdctrl k
search every conference, speaker and series
/
focus the filter search
h
home
c
conferences
s
speakers
e
series
t
light / dark — the status bar button does the same
?
this help
esc
close this, then clear every filter — or just the search, while you are typing in it

Ignored while you are typing. Pages without a filter rail have no search to focus.