Predictably Agile
summary
Argues that predictability means narrowing lead time variation rather than promising exact scope, uses cycle‑time scatterplots and percentiles (P85=16 days, P20=2 days → wide window) and shows halving cycle times yields P85=8/P20=1 but standard metrics like coefficient of variation and a “cycle‑time inequality” fail to capture usefulness. Proposes aging WIP and blocker tracking as leading indicators, uses Actionable Agile (with Jira plugin) dashboards and blocker heatmaps, and reports blocker counts >30 days falling from ~25 to <10, improving forecast usefulness.
AI-written summary · about
chapters (11)
- 0:00Start
- 3:03What kind of predictability?
- 7:18Measuring Business Impacts
- 13:30SAFe Program Predictability
- 22:17What is the range?
- 23:15Narrowing the gap
- 24:18Hypothesis 2
- 28:21Reducing Cycle Time
- 28:57Aging WIP
- 31:54Blockers
- 35:33How do you feel about measuring agile predictability?
related talks
43mPredictable Delivery
01h 04mIs Agile Still the Answer? Lessons from Real World Agility
16mPractically predictable – Forecasting delivery when nothing is certai
46mEstimates and complexity: a tale in 42 and a half minutes
44mAgile metrics for predicting the future
23mBeyond Jira: Decode that Control Chart
51mMastering Trade-offs for Scaled Agile Success
43mMind the gap – incorporating the change agenda into scaled Agile.
