~/talk

Shift-Left Performance Engineering for RAG and LLM Platforms

slides:none on file

Shift-left CI/CD adds an automated deviation score gate that evaluates time-to-first-token, token count, LLM call count, tool latency and error/retry rates against an adaptive 30-day baseline and blocks builds over ~2σ; implemented in eight weeks on Kubernetes with OpenAI spec–generated workloads, Prometheus/Grafana metrics, LangFuse/LangSmith/Arize tracing, PostgreSQL and Redis. Results: development-detected defects +200%, mean time to detect down ~99%, response time ~40% faster, monthly incidents down ~30–40%, feedback returns in 15–20 minutes.

AI-written summary · about

  1. 0:00Welcome and Topic
  2. 0:49The Missing Gate
  3. 1:20Why LLM Defects Hurt
  4. 3:28Shift Left Framework
  5. 5:50Six Layer Architecture
  6. 8:32Deviation Score Gate
  7. 10:38Agentic Metrics That Matter
  8. 14:20Reading a Trace Signature
  9. 16:47CI CD Pipeline Walkthrough
  10. 19:16Tooling Integration Patterns
  11. 21:15Eight Week Implementation Plan
  12. 23:44Results and Productivity Gains
  13. 25:37Lessons and Best Practices
  14. 27:59Next Gen Improvements
  15. 30:54Demo Performance Gate
  16. 36:03Key Takeaways and Close
~/search
type to search 6,249 conferences, 138,987 speakers and 185,172 talks
~/help
cmdctrl k
search every conference, speaker and series
/
focus the filter search
h
home
c
conferences
s
speakers
e
series
t
light / dark — the status bar button does the same
?
this help
esc
close this, then clear every filter — or just the search, while you are typing in it

Ignored while you are typing. Pages without a filter rail have no search to focus.