Project delivers over 100,000 strands per path by jetting hundreds of cables instead of buying paths from carriers, using 148 864‑fiber cables in phase one and 76 1728‑fiber runs in phase two. Team selects AFL’s 864 and develops a 1728 fiber 16.4 mm cable to double capacity in the same conduit, jets cables with cascaded machines (up to seven per run, reduced spacing to ~1,800–2,500 ft), digs 9 ft by 20 ft trenches and 10x12 ft vaults, and lays 2.1M fiber‑km within 5 km.
AI-written summary · about
chapters (5)
- 0:00Introduction
- 2:54Fiber innovations for Prometheus AI cluster
- 5:47Civil engineering challenges
- 12:29Fiber jetting and placement
- 16:28Key takeaways from the Prometheus project
related talks
09m20,000 Leagues Inside the Optical Fiber
17mMeta’s Network Journey to Enable AI
57mThe Undersea Cable Network
22m10x Backbone: Scaling Backbone Connectivity to Serve AI Demands
21mDC Networks for Generative AI
24mWiring the Planet: Scaling Meta's Global Optical Network
10m20,000 Leagues Inside the Optical Fiber
51mThe Undersea Cable Network