Migrating VLDBs from Oracle to Azure Database for PostgreSQL
summary
Migration strategy for multi‑terabyte Oracle workloads shows a successful 16 TB case that uses a phased approach: Ora2Pg for schema conversion, parallel partitioned loads via Azure Data Factory, and continuous sync with Striim to achieve a near‑zero‑downtime cutover (minutes of downtime). Guidance covers sizing WAL throughput/IOPS from Oracle AWR, handling LOBs by offloading to Azure Storage, avoiding bloat/autovacuum stalls, and spending months and multiple tuning cycles (4–5) to reach predictable performance.
AI-written summary · about
chapters (9)
- 0:00Music & introduction
- 1:04The problem of large database migration
- 2:02Why customers choose PostgreSQL
- 3:54Key challenges in VLDB migration
- 9:00Customer case study: oracle to PostgreSQL
- 15:40VLDB migration lifecycle, process, & tool recommendations
- 19:02Advanced considerations: complexity, scale, & time
- 21:46Common pitfalls and optimization strategies
- 24:20Closing remarks and resources
related talks
24mPartitioning strategy for Oracle to PostgreSQL migrations on Azure
29mTales from the Field - Oracle to PostgreSQL migrations
24mMigrating from Oracle to Azure Database for PostgreSQL, Seamlessly
49mIt keeps getting easier to move Oracle and Open Source workloads to Azure
56mMigrate Databases to the Cloud - Why, How and Best Practices
56mSeamless Migration to Azure Database for PostgreSQL
30mAn Assessment-to-Adoption Path from Oracle, SQL Server, Sybase, DB2 onto
42mMigrating a database over 10TB from DB2 to PostgreSQL with zero downtime
